The December 2010 issue contains a paper on the Geotechnical aspects of Incheon Bridge project by Dr. Sung Min Cho. The geotechnical aspects of the foundation works and related items were presented in this paper. The mission of Incheon Bridge project was to make a 21.4 km long national expressway between Incheon
International Airport (IIA) and New Songdo City crossing the Yellow Sea. The expressway has 6 lanes for two way traffics and 86 % of the total length, as same as 18,348 m (approximately 18.4 km) is a continuously connected bridge.