- MRT Line 1
Underground Infrastructure The 51km-long Klang Valley Mass Rapid Transit SBK Line, better known as MRT Line 1 connects Sg. Buloh and Kajang city across 31 stations. […] - MRT Line 2
Underground Infrastructure MRT Line 2 (SSP Line) project began in 2016, where G&P Professionals Sdn Bhd (in association with Geoconsult Asia Singapore Pte Ltd and Zaidun-Leeng Sdn Bhd) […] - KT Drawbridge
Bridge Infrastructure
Malaysia’s first drawbridge project, which is located at the mouth of Kuala Terengganu River, connects the northern and southern divided developments. […] - Melaka Gateway
Reclamation
The Melaka Gateway is located in Melaka City, on the northern side of the Straits of Melaka, around 150km southeast of Kuala Lumpur. […] - PNB 118
Skyscraper Foundation
PNB 118 is a geometrically-intricate 118-story office and hotel tower that will be home to the headquarters for Permodalan Nasional Berhad (PNB), one of Malaysia’s leading investment firms […] - Northern Double Track
The construction of the Double Track from Alor Setar to Padang Renggas (about 200km) in the northern part of Peninsular Malaysia commenced in 2007. […] - Floating Piled Raft Foundation on Soft Ground
Conventional piled foundation is usually designed to provide adequate load carrying capacity to limit the overall settlement and hence indirectly control differential settlement within tolerable limits. […]
AGSSEA-SEAGS CIRCULARS|NEWS – September 2018
Posted in: AGSSEA-SEAGS Circulars | News